No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

CLI-based Configuration Guide - Network Management and Monitoring

AR100, AR120, AR160, AR1200, AR2200, AR3200, and AR3600 V300R003

This document provides the basic concepts, configuration procedures, and configuration examples in different application scenarios of the network management feature supported by the device.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Starting an NQA Test Instance

Starting an NQA Test Instance

Context

After completing the configuration of an NQA test instance, start the NQA test instance in following modes:
  • Start the NQA test instance immediately.
  • Start the NQA test instance at a specified time.
  • Start the NQA test instance after a delay.

If the test fails, restart the NQA test instance in the next time period.

NOTE:
  • If the number of running test instances reaches the maximum value defined by the system, the start command is invalid.
  • For the same test instance, the start now command can be used again only when the previous test is complete.
  • The specified time to start a test instance must be later than the current time of the device.

Procedure

  • Start an NQA test instance.
    1. Run system-view

      The system view is displayed.

    2. Run nqa test-instance admin-name test-name

      The NQA view is displayed.

    3. Run startstart now [ end { at [ yyyy/mm/dd ] hh:mm:ss | delay { seconds second | hh:mm:ss } | lifetime { seconds second | hh:mm:ss } } ]start at [ yyyy/mm/dd ] hh:mm:ss [ end { at [ yyyy/mm/dd ] hh:mm:ss | delay { seconds second | hh:mm:ss } | lifetime { seconds second | hh:mm:ss } } ]start delay { seconds second | hh:mm:ss } [ end { at [ yyyy/mm/dd ] hh:mm:ss | delay { seconds second | hh:mm:ss } | lifetime { seconds second | hh:mm:ss } } ]

      The NQA test instance is started.

      • Run

        The NQA test instance is started immediately.

      • Run

        The NQA test instance is started in a specified time.

      • Run

        The NQA test instance is started after a specified delay.

  • Restart an NQA test instance.
    1. Run system-view

      The system view is displayed.

    2. Run nqa test-instance admin-name test-name

      The NQA view is displayed.

    3. Run restart

      Then NQA test instance is restarted.

      • The restart command stops the running test instance and restart it.
      • The restart command functions the same as the start now command.

Translation
Download
Updated: 2019-03-06

Document ID: EDOC1100069336

Views: 33299

Downloads: 189

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next