AMI Smart Meter Reading Solution V200R010C10 Planning and Design Guide

This document describes the overall and detailed design of functions and services in the AMI Smart Meter Reading Solution.

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Interconnection Between the EEM and DCP

Interconnection Between the EEM and DCP

The EEM supports one DCP cluster that allows a maximum of 20 DCP nodes. The DCP can be deployed on the cloud data center server or data perception layer server (the DCP is deployed on the cloud here). Ensure that there are reachable routes between the EEM and its managed DCP nodes.

The EEM communicates with the DCP using HTTP/HTTPS or FTP/SFTP over the Ethernet. After a connection is set up between the EEM and DCP, the EEM delivers parameters to the DCP through the RESTful interface, and the DCP reports alarms to the EEM through corresponding interfaces.

Translation
Download
Updated: 2019-03-07

Document ID: EDOC1100069579

Views: 8627

Downloads: 15

Average rating:
This Document Applies to these Products

Related Version

Related Documents

Share
Previous Next