No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

Huawei SAP HANA Appliance HA and DR Scheme Configuration Guide 02

Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Network Planning

Network Planning

The system replication channel between the primary and secondary nodes is connected through two bonded ports (each bonded port aggregates two 10GE optical ports). The DR node is connected through a bonded 10GE optical port to a service switch through a bonded 10GE optical port, and then connected to the secondary node for data synchronization.

Translation
Download
Updated: 2019-03-30

Document ID: EDOC1100073265

Views: 1246

Downloads: 7

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next