No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

Huawei SAP HANA Appliance HA and DR Scheme Restore Guide 03

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Takeover Procedure

Takeover Procedure

  1. Run the HDB stop command on DCN01 to stop the database.

  2. Log in to the database from the studio using the physical IP address and check the SR status.

  3. Run the HDB stop command on DCN02 to stop the database.

  4. Run the hdbnsutil -sr_takeover command on DCN03 for it to take over services.

    hs4adm@DCN03:/usr/sap/HS4/HDB90> hdbnsutil -sr_takeover
    checking local nameserver ...
    done.

    DCN03 now is the primary node. The following figure shows the network diagram after the takeover.

Translation
Download
Updated: 2019-03-30

Document ID: EDOC1100073266

Views: 1270

Downloads: 20

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next