No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

eLog V200R007C10 Installation Guide

Describes the installation process of product software. Includes plans, environmental requirements, and procedures for installation, as well as commissioning procedures.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Security Hardening Rollback

Security Hardening Rollback

Security hardening rollback restores the status of ports, services, and remote control permissions to that before the security hardening.

Procedure

  1. Log in to the operating system as root.
  2. Right-click the desktop to open the terminal.
  3. Run the cd hardening-tool-directory command to access the directory where the hardening tool resides.
  4. Run the ./rollback.sh command to start rolling back.
  5. If the following information is displayed, security hardening rollback is complete.

    Rollback successfully, please reboot the system.

  6. Run the reboot command to validate the configuration.
Translation
Download
Updated: 2019-04-01

Document ID: EDOC1100073937

Views: 9579

Downloads: 16

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next