No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

eLog V200R007C10 Installation Guide

Describes the installation process of product software. Includes plans, environmental requirements, and procedures for installation, as well as commissioning procedures.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Distributed Analyzer

Distributed Analyzer

In the preinstallation scenario of the distributed analyzer, upon delivery, the OS, database, and eLog software have been installed, and the system security has been hardened. Modify the preinstallation parameters based on the following configuration process.

Figure 3-6 Configuration process diagram of the distributed analyzer in the preinstallation scenario
Translation
Download
Updated: 2019-04-01

Document ID: EDOC1100073937

Views: 7633

Downloads: 14

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next