Unpacking
- Check whether the packing case and seals are in good conditions.
If the packing case is soaked or deformed, or the seals or pressure-sensitive adhesive tapes are not intact, fill in the Cargo Problem Feedback Form.
- Use a box cutter to cut the pressure-sensitive adhesive tape and remove the packing case.
Exercise caution with the box cutter to avoid injury to your hands or damage to devices.
- Check that the number of components is consistent with that specified in the Packing List and the components are in good condition, without defects such as oxidation, chemical corrosion, or other damage incurred during transport. Table 7-1 shows the packing list.Table 7-1 Packing list
No.
Description
1
Documentation bag containing a warranty card and quick start guide
2
Accessory package (power adapter and two external camera cables)
NOTE:- Adapter power cables are included for delivery outside China.
- The mainboard is IT21DMDA. No external camera cable is delivered.
3
One Atlas 200 DK developer kit (model 3000)