No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FusionStorage 8.0.0 DSware Tool Command Reference 02

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Changing the Status of a VBS Node for Whether It Can Be Elected as the Leader Node

Changing the Status of a VBS Node for Whether It Can Be Elected as the Leader Node

This operation is risky. You must confirm whether to continue to execute the command.

Run the following command to change the status of a VBS node for whether it can be elected as the leader node:

./dswareTool.sh --op modifyVbsType -status status -vbsIpList ip1,ip2,ip3,...

Parameter

Description

./dswareTool.sh

Specifies an executable program for the tool.

--op queryArmCoreBindMode

Changes the status of a VBS node for whether it can be elected as the leader node.

-status status

Specifies the status of the VBS node for whether it can be elected as the leader node. The value can be 0 (the node can be elected as the leader node) or 1 (the node cannot be elected as the leader node).

-vbsIpList ip1,ip2,ip3,...

Specifies the management IP address of the VBS node.

An example is provided as follows:

[dsware@FSM01 bin]$ ./dswareTool.sh --op modifyVbsType -status 1 -vbsIpList 172.17.37.11,172.17.37.12,172.17.37.13
[Tue Sep 26 11:20:27 CST 2017] DswareTool operation start.
Enter User Name:admin
Enter Password :
Operation finish successfully. Result Code:0
The count of successful nodes is 3.

The count of failed nodes is 0.

[Tue Oct 24 14:21:12 CST 2017] DswareTool operation end.

An example is provided as follows:

[dsware@FSM01 bin]$ ./dswareTool.sh --op modifyVbsType -status 1 -vbsIpList 2016:8:40:160:c13:0:169:32,2016:8:40:160:c13:0:169:34,2016:8:40:160:c13:0:169:36
[Tue Sep 26 11:20:27 CST 2017] DswareTool operation start.
Enter User Name:admin
Enter Password :
Operation finish successfully. Result Code:0
The count of successful nodes is 3.

The count of failed nodes is 0.

[Tue Oct 24 14:21:12 CST 2017] DswareTool operation end.
Translation
Download
Updated: 2019-07-12

Document ID: EDOC1100081411

Views: 4823

Downloads: 3

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next