No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FusionStorage 8.0.0 Block Storage Hardware Installation Guide 06

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Label Installation Specifications

Label Installation Specifications

Context

An engineering label is an identification mark for onsite installation and subsequent maintenance.

Engineering labels have two types. One type is attached to signal cables, including network cables and optical fibers; and the other type is attached to power cables, including AC power cables.

The purpose of attaching engineering labels is to ensure correct and neat installation, and facilitate maintenance.

For the consistency of all device labels in an equipment room, the labels can be filled in with the content defined by a user, which must be specified in the self-check report.

Download
Updated: 2019-11-14

Document ID: EDOC1100081415

Views: 8025

Downloads: 15

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next