No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FusionStorage 8.0.0 Block Storage Hardware Installation Guide 06

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Checking the Installation

Checking the Installation

About This Chapter

After all devices and cables are installed, check whether they work properly.

Prerequisites

  • Hardware has been installed.
  • Required documents have been prepared, including Engineering Design Documents and Hardware Quality Standards.
  • Required tools and materials have been prepared. For details, see Obtaining Tools and Meters.

Context

After installing all hardware, you must check the installation by referring to Huawei-formulated hardware quality standards, ensuring that the hardware installation is correct and preparing for subsequent software installation and system commissioning.

Procedure

Figure 11-1 shows the installation check procedure.

Figure 11-1 Installation check procedure

Installation check items are as follows:

Download
Updated: 2019-11-14

Document ID: EDOC1100081415

Views: 6974

Downloads: 15

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next