No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FusionStorage 8.0.0 Block Storage Parts Replacement 03

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Putting a 2288H V5 Node or TaiShan 2280 V2 12-Slot Node into Its Cabinet

Putting a 2288H V5 Node or TaiShan 2280 V2 12-Slot Node into Its Cabinet

  1. Pull out the inner rails as far as they will go, as shown in Figure 25-3.

    Figure 25-3 Pulling out inner rails

  2. Align the screws on the storage node with the notches on the inner rails, push the storage node inwards until you hear a sound, and ensure that the latches eject and completely block the screws to affix the storage node to the inner rails, as shown in Figure 25-4.

    Figure 25-4 Attaching a storage node to inner rails

  3. Press the release buttons on both sides and push the storage node into the cabinet along the holding rails, as shown in step 1 and step 2 in Figure 25-5.

    Figure 25-5 Pushing a storage node into a cabinet along the holding rails

  4. Tighten the captive screws on the mounting ears to secure the storage node, as shown in Figure 25-6.

    Figure 25-6 Securing a storage node

Translation
Download
Updated: 2019-08-19

Document ID: EDOC1100081420

Views: 4797

Downloads: 4

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next