About This Document
Purpose
This document describes the SUN2000-8KTL-M0, SUN2000-10KTL-M0, SUN2000-12KTL-M0, SUN2000-15KTL-M0, SUN2000-17KTL-M0, and SUN2000-20KTL-M0 (SUN2000 for short) in terms of installation, electrical connections, commissioning, maintenance, and troubleshooting. Read this document through, understand the safety information, and get familiar with the functions and features of the SUN2000 before installing and operating it.
The SUN2000-8KTL-M0 and SUN2000-10KTL-M0 inverters are applicable only to Australia.
Intended Audience
This document is intended for:
- Installers
- Users
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Symbol |
Description |
---|---|
Indicates a hazard with a high level of risk which, if not avoided, will result in death or serious injury. |
|
Indicates a hazard with a medium level of risk which, if not avoided, could result in death or serious injury. |
|
Indicates a hazard with a low level of risk which, if not avoided, could result in minor or moderate injury. |
|
Indicates a potentially hazardous situation which, if not avoided, could result in equipment damage, data loss, performance deterioration, or unanticipated results. NOTICE is used to address practices not related to personal injury. |
|
Supplements the important information in the main text. NOTE is used to address information not related to personal injury, equipment damage, and environment deterioration. |
Change History
Changes between document issues are cumulative. The latest document issue contains all updates made in previous issues.
Issue 08 (2023-05-17)
Updated Safety Information
Issue 07 (2023-01-17)
Updated Preparing for Installation
Issue 06 (2019-07-02)
Updated Grid Codes
Issue 05 (2019-11-12)
- Updated the appearance and installation diagrams because the structure of the mounting bracket at the lower part of the inverter rear panel is changed.
- Updated the screenshots of the FusionSolar app.
- Updated AFCI.
Issue 04 (2019-10-18)
- Updated Preparing for Installation and changed the WLAN Smart Dongle to the WLAN-FE Smart Dongle.
- Updated (Optional) Installing the Smart Dongle and added the installation method of the WLAN-FE Smart Dongle.
- Updated (Optional) Installing the Signal Cable. The Dongle signal cable supports the cascading of multiple inverters.
- Updated Connecting the RS485 Communications Cable (Smart Power Sensor) and added the three-phase three-wire wiring diagram.
- Updated Powering On the System and added indicator description about the WLAN-FE Smart Dongle and 4G Smart Dongle.
- Updated Commissioning, modified the scenario names, FusionSolar app download methods, and app screenshots, and added version description about FusionSolar app supported by the WLAN-FE Smart Dongle.
- Updated Setting Export Limitation Parameters and modified the screenshots and parameter description.
Issue 03 (2019-07-19)
- Added AFCI.
- Added IPS Test (for Italy CEI0-21 Grid Code only).
- Added SUN2000-8KTL-M0 and SUN2000-10KTL-M0 inverters are applicable only to Australia.
Issue 02 (2019-06-30)
Issue 01 (2019-05-08)
This issue is used for first office application (FOA).