Checking Before Installation
Outer Packing Materials
Before unpacking the inverter, check the outer packing materials for damage, such as holes and cracks, and check the inverter model. If any damage is found or the inverter model is not what you requested, do not unpack the package and contact your supplier as soon as possible.
You are advised to remove the packing materials within 24 hours before installing the inverter.
Package Contents
- After placing the equipment in the installation position, unpack it with care to prevent scratches. Keep the equipment stable during unpacking.
After unpacking the inverter, check that the contents are intact and complete. If any damage is found or any component is missing, contact your supplier.
For details about the number of contents, see the Packing List in the packing case.