No relevant resource is found in the selected language.
Your browser version is too early. Some functions of the website may be unavailable. To obtain better user experience, upgrade the browser to the latest version.
SUN2000-(75KTL, 100KTL, 110KTL, 125KTL) Series User Manual
This document describes the SUN2000-(75KTL,100KTL, 110KTL, 125KTL) series in terms of their installation, electrical connections, commissioning, maintenance, and troubleshooting.
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document.
Note: Even the most advanced machine translation cannot match the quality of professional translators.
Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
(Optional) Installing the Power Cable of the Tracking System
(Optional) Installing the Power Cable of the Tracking System
Precautions
The tracking system obtains power from the AC three-phase power grid. The rated voltage of the power supply is the rated output voltage of the solar inverter.
Keep flammable materials away from the power cable.
The power cable must be protected with a conduit to prevent short circuits caused by insulation layer damage.
Connect the power cable of the tracking system before the AC output power cable. Otherwise, reworking will be caused.
Procedure
Prepare a cable.
Remove the corresponding rubber rings.
Connect the power cable of the tracking system.
Figure 5-11 Connecting the power cable of the tracking system