No relevant resource is found in the selected language.
Your browser version is too early. Some functions of the website may be unavailable. To obtain better user experience, upgrade the browser to the latest version.
SUN2000-(75KTL, 100KTL, 110KTL, 125KTL) Series User Manual
This document describes the SUN2000-(75KTL,100KTL, 110KTL, 125KTL) series in terms of their installation, electrical connections, commissioning, maintenance, and troubleshooting.
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document.
Note: Even the most advanced machine translation cannot match the quality of professional translators.
Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Connecting the RS485 Communications Cables
Connecting the RS485 Communications Cables
Pin Definitions of the Communications Port
Figure 5-33 Communications port
Port
Pin
Definition
Pin
Definition
Description
RS485-1
1
RS485A IN, RS485 differential signal+
2
RS485A OUT, RS485 differential signal+
Used for cascading solar inverters or connecting to devices such as the SmartLogger.
3
RS485B IN, RS485 differential signal–
4
RS485B OUT, RS485 differential signal–
Protection ground
5
PE, shielding ground
6
PE, shielding ground
N/A
RS485-2
7
RS485A, RS485 differential signal+
8
RS485B, RS485 differential signal–
Used for connecting to an RS485 slave device.
In the scenario of SDongle networking or a single solar inverter, the RS485-2 port is connected to a power meter to collect information about power at the grid-tied point for grid-tied point power control.
In the scenario of intelligent support tracking control, the RS485-2 port is connected to the support tracking system to collect support information.
Connecting the RS485 Communications Cables
When routing the communications cable, separate it from power cables to prevent communication from being affected. Connect the shield layer to the PE point. This section describes how to connect three communications cables.