SUN2000-(100KTL, 110KTL, 125KTL) Series User Manual

This document describes the SUN2000-125KTL-M0,SUN2000-110KTL-M0,SUN2000-100KTL-M0,SUN2000-100KTL-M1 and SUN2000-100KTL-INM0 in terms of its installation, electrical connections, commissioning, maintenance, and troubleshooting. BOM number: 01074693, 01074694, 01074695, 01074695-001 and 01074695-002.

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Securing Y-Branch Connectors

Securing Y-Branch Connectors

The DC input terminals of the solar inverter are prone to damage under stress. When Y-branch connectors are connected to the solar inverter, bind and secure the connectors to prevent the DC input terminals from bearing stress. You are advised to install a tray or beam to secure the Y-branch connectors.

Method 1: Using a Tray

Prepare a tray based on the base size of the solar inverter and the cabling of the Y-branch connectors.

  • Material: outdoor corrosion-resistant material
  • Bearing capacity: ≥ 10 kg
Figure A-1 Recommended dimensions
  1. Install a tray.

    Figure A-2 Installing a tray

  2. Place the Y-branch connectors on the tray.

    Figure A-3 Placing Y-branch connectors

Method 2: Using a Beam

Prepare a beam based on the base size of the solar inverter and the cabling of the Y-branch connectors.

  • Material: outdoor corrosion-resistant material
  • Bearing capacity: ≥ 10 kg
Figure A-4 Recommended dimensions
  1. Install a beam.

    Figure A-5 Installing a beam

  2. Bind the Y-branch connectors on the beam.

    Figure A-6 Binding Y-branch connectors

Download
Updated: 2020-02-27

Document ID: EDOC1100087908

Views: 8365

Downloads: 1039