SUN2000-(100KTL, 110KTL, 125KTL) Series User Manual

This document describes the SUN2000-125KTL-M0,SUN2000-110KTL-M0,SUN2000-100KTL-M0,SUN2000-100KTL-M1 and SUN2000-100KTL-INM0 in terms of its installation, electrical connections, commissioning, maintenance, and troubleshooting. BOM number: 01074693, 01074694, 01074695, 01074695-001 and 01074695-002.

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Power-Off for Troubleshooting

Power-Off for Troubleshooting

Context

To prevent personal injury and equipment damage, perform the following procedure to power off the solar inverter for troubleshooting or replacement.

  • When a solar inverter is faulty, try to avoid standing in front of the solar inverter.
  • Do not operate the DC switch on the solar inverter before you finish 3 to 5.
  • If the AC switch between the solar inverter and the power grid has automatically disconnected, do not turn on the switch before the fault is rectified.
  • Before power-off for troubleshooting, do not touch the energized components of the solar inverter. Otherwise, electric shocks or arcing may occur.

Procedure

  1. Wear proper personal protective equipment (PPE).
  2. If the solar inverter is not shut down due to a fault, send a shutdown command on the SUN2000 app, SmartLogger, or management system. If the solar inverter has shut down due to a fault, go to the next step.
  3. Turn off the AC switch between the solar inverter and the power grid.
  4. Measure the DC current of each PV input string using a clamp meter that is set to the DC position.

    • If the current is less than or equal to 0.5 A, go to the next step.
    • If the current is higher than 0.5 A, wait until the solar irradiance decreases and the PV string current decreases below 0.5 A at night, and then go to the next step.

  5. Open the maintenance compartment door, install a support bar, and use a multimeter to measure the voltage between the AC terminal block and the ground. Ensure that the AC side of the solar inverter is disconnected.
  6. Turn off all DC input switches of the solar inverter.

    Figure 8-1 Power-off for maintenance

  7. Wait for 15 minutes and troubleshoot or repair the inverter.

    • Do not open the host panel for maintenance if the solar inverter is emitting odor or smoke, or has obvious exceptions.
    • If the solar inverter does not emit odor or smoke and is intact, repair or restart it based on the alarm handling suggestions. Do not stand in front of the solar inverter during the restart.

Translation
Download
Updated: 2020-02-03

Document ID: EDOC1100087908

Views: 7597

Downloads: 924

Average rating:
This Document Applies to these Products

Related Version

Related Documents

Share
Previous Next