About This Document
Purpose
This document describes how to inspect the Huawei SAP HANA appliance. The inspection includes compatibility check, resource usage check, two-node and cluster status check, SAP note configuration check, and log collection method check.
Intended Audience
This document is intended for:
- Technical support engineers
- Maintenance engineers
- Users
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Symbol |
Description |
---|---|
Indicates an imminently hazardous situation which, if not avoided, will result in death or serious injury. |
|
Indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury. |
|
Indicates a potentially hazardous situation which, if not avoided, may result in minor or moderate injury. |
|
Indicates a potentially hazardous situation which, if not avoided, could result in equipment damage, data loss, performance deterioration, or unanticipated results. NOTICE is used to address practices not related to personal injury. |
|
Calls attention to important information, best practices and tips. NOTE is used to address information not related to personal injury, equipment damage, and environment deterioration. |
Change History
Changes between document issues are cumulative. The latest document issue contains all the changes made in earlier issues.
Issue 02 (2020-10-15)
This issue is the second official release. Updated Methods for Collecting Logs.
Issue 01 (2019-06-13)
This is the first official release.