No relevant resource is found in the selected language.
Your browser version is too early. Some functions of the website may be unavailable. To obtain better user experience, upgrade the browser to the latest version.
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document.
Note: Even the most advanced machine translation cannot match the quality of professional translators.
Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Checking the Water Cooling Module
Checking the Water Cooling Module
Table 5-5 Installation checklist
Check Item
Expected Result
Actual Result
Rack
The rack is installed properly, without any tilt.
□ Passed □ Failed
Pipes
Ports are connected correctly, and all pipes are wrapped with thermal insulation foam
□ Passed □ Failed
Electric
The power cables and signal cable are connected as required.