Securing the Cabinet
Procedure
- Determine the position for installing the cabinet.
- Drill a hole in each mounting hole position using a hammer drill.
- Move the cabinet over its castors to the installation position.
- Level the cabinet using an adjustable wrench, as shown in Figure 4-31.
Before leveling the cabinet, use a measuring tape to check that the vertical distance between the top of the cabinet and the floor is 2000 mm (+3 mm) for a 2000 mm high cabinet or 2200 mm (+3 mm) for a 2200 mm high cabinet. Ensure that the cabinet is level using a level.
- Do not remove the anchor bolts. Otherwise, rework is required if the cabinet height does not meet requirements.
- Anchor bolt adjustment method: Rotate anchor bolts clockwise to raise the cabinet and rotate them counterclockwise to lower the cabinet. Anchor bolts can be adjusted within a range of 0–8 mm.
- Levelness check standard: Ensure that the cabinet is level in width and depth directions when leveling the cabinet. Put a level at the bottom of the cabinet in width and depth directions and check that the air bubble is in the middle between the two lines marked on the glass tube, as shown in Figure 4-31.
- Shock absorption bars (EPDM rubber, 5 mm thick) are need to install between the ground and the base.
- (Optional) Combine the cabinets, as shown in Figure 4-32.
- Secure the smart cooling product cabinet to the ground using the M12 expansion bolts.Figure 4-33 Securing a cabinet
- Install sealing plates to the front and rear doors. (Sealing plates are not in the fittings bag of the smart cooling product but supplied by the smart module or purchased independently.)Figure 4-34 Installing sealing plates