No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

SmartLogger3000 User Manual

This document describes the SmartLogger3000 and SmartModule1000A01 in terms of installation, electrical connections, system operation, maintenance, and troubleshooting. BOM number: 02312SCU, 02312SCU-001, 02312SCU-002, 02312SCU-003, 02312SCU-004, 02312SCU-005, 02312SCU-006, 02312SCU-007, 02312SCU-008, 02312SCU-009, 02312SCU-010, 02312SGF, 02312SGG, 02312SGK and 02312SGJ.

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Connecting the PT Signal Cable

Connecting the PT Signal Cable

Context

The SmartModule provides two PT ports, which can be used to connect to three-wire or two-wire PT100/PT1000 temperature sensors.

When a PT port needs to be connected to a two-wire PT100/PT1000, use a short-circuit cable to short-circuit GND and of the port.

Procedure

  1. Connect the PT signal cable.

    Figure 4-22 Connection to a three-wire PT100/PT1000

    (1) PT100/PT1000 temperature sensor

    Figure 4-23 Connection to a two-wire PT100/PT1000

    (1) PT100/PT1000 temperature sensor

Translation
Download
Updated: 2020-02-21

Document ID: EDOC1100108365

Views: 7494

Downloads: 1285

Average rating:
This Document Applies to these Products

Related Version

Related Documents

Share
Previous Next