No relevant resource is found in the selected language.
Your browser version is too early. Some functions of the website may be unavailable. To obtain better user experience, upgrade the browser to the latest version.
This document describes the SmartLogger3000 and SmartModule1000A01 in terms of installation, electrical connections, system operation, maintenance, and troubleshooting.
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document.
Note: Even the most advanced machine translation cannot match the quality of professional translators.
Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Domain Name List of Management Systems
Domain Name List of Management Systems
The list is subject to change.
Table B-1 Domain names of management systems
Domain Name
Data Type
Scenario
intl.fusionsolar.huawei.com
Public IP address
FusionSolar SmartPVMS
NOTE:
The domain name is compatible with cn.fusionsolar.huawei.com (Chinese mainland).
neteco.alsoenergy.com
Public IP address
Partner management system
re-ene.kyuden.co.jp
Public IP address
Remote output control server of Kyushu Electric Power Company
re-ene.yonden.co.jp
Public IP address
Remote output control server of Shikoku Electric Power Company