No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade
SmartLogger3000 User Manual

This document describes the SmartLogger3000 and SmartModule1000A01 in terms of installation, electrical connections, system operation, maintenance, and troubleshooting. BOM number: 02312SCU, 02312SCU-001, 02312SCU-002, 02312SCU-003, 02312SCU-004, 02312SCU-005, 02312SCU-006, 02312SCU-007, 02312SCU-008, 02312SCU-009, 02312SCU-010, 02312SGF, 02312SGG, 02312SGK and 02312SGJ.

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Setting User Parameters

Setting User Parameters

Set user parameters and click Submit.

Figure 6-6 Setting user parameters

Date&Time

Parameter

Description

Local time zone

Select a time zone based on the region where the PV plant is located.

DST enable

Set this parameter as required.

NOTE:

This parameter is unavailable for zones without DST.

Date

Set this parameter to the local date.

Time

Set this parameter to the local time.

Clock source

Set this parameter as required.

The value can be NTP, Management System, IEC104, or Modbus TCP. If there is no management system, ignore the corresponding setting.

  • After the date and time are set, the date and time of all the inverters connected to the SmartLogger are updated accordingly. Ensure that the settings are correct.
  • Changing the date and time affects the recording of system energy yield and performance data. Do not change the time zone or system time unless necessary.

Plant

Parameter

Description

Plant name

Set this parameter as required.

NOTE:

In the English half-width status, you cannot enter any of the following characters: <>:,`'?()#&\$|%+;~^"

Plant address

Plant owner

Plant owner address

Country/Region

Select a country/region based on the region where the PV plant is located.

Revenue

Parameter

Description

Currency

Set this parameter as required.

The value can be EUR, GBP, USD, CNY, or JPY.

Electricity price/kWh

Set this parameter to the local electricity price, which is used to calculate the converted revenue of the energy yield.

CO2 emission reduction coefficient

Set this parameter based on the local standard.

Save Period

Parameter

Description

Performance data save period

Set this parameter to the save period of performance data. After the setting, the data will be displayed accordingly on the performance data page.

Translation
Download
Updated: 2020-03-23

Document ID: EDOC1100108365

Views: 11554

Downloads: 1805

Average rating:
This Document Applies to these Products

Related Version

Related Documents

Share
Previous Next