No relevant resource is found in the selected language.
Your browser version is too early. Some functions of the website may be unavailable. To obtain better user experience, upgrade the browser to the latest version.
This document describes the SmartLogger3000 and SmartModule1000A01 in terms of installation, electrical connections, system operation, maintenance, and troubleshooting.
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document.
Note: Even the most advanced machine translation cannot match the quality of professional translators.
Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Exporting Configuration Files from the SmartLogger WebUI
Exporting Configuration Files from the SmartLogger WebUI
Before replacing the SmartLogger, export its configuration files to a local PC. Perform operations by referring to Exporting Full Configuration Files.
Power off the SmartLogger, remove its cables, and label the cables.
Install a new SmartLogger, reconnect the cables, and power on the SmartLogger.
Log in to the WebUI and import the exported configuration files from the local PC to the new SmartLogger. Perform operations by referring to Importing Full Configuration Files.
After the import is successful, the SmartLogger restarts for the configuration files to take effect. Ensure that the parameters on the settings tab page and the parameters for the built-in MBUS are correctly set.