SmartLogger3000 User Manual

This document describes the SmartLogger3000 and SmartModule1000A01 in terms of installation, electrical connections, system operation, maintenance, and troubleshooting. BOM number: 02312SCU, 02312SCU-001, 02312SCU-002, 02312SCU-003, 02312SCU-004, 02312SCU-005, 02312SCU-006, 02312SCU-007, 02312SCU-008, 02312SCU-009, 02312SCU-010, 02312SGF, 02312SGG, 02312SGK and 02312SGJ.

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Introduction to WebUI

Introduction to WebUI

  • The web software version corresponding to the WebUI screenshots in this document is SmartLogger V300R001C00SPC010. The screenshots are for reference only.
  • The parameter names, value ranges, and default values are subject to change. The actual display prevails.
  • Delivering a reset, shutdown, or upgrade command to the solar inverters may cause power grid connection failure, which affects the energy yield.
  • Only professionals are allowed to set the grid parameters, protection parameters, feature parameters, and power adjustment parameters of the solar inverters. If the grid parameters, protection parameters and feature parameters are incorrectly set, the solar inverters may not connect to the power grid. If the power adjustment parameters are incorrectly set, the solar inverters may not connect to the power grid as required. In these cases, the energy yield will be affected.
  • Only professionals are allowed to set the power grid scheduling parameters of the SmartLogger. Incorrect settings may cause the PV plant to fail to connect to the power grid as required, which affects the energy yield.
Translation
Download
Updated: 2020-03-23

Document ID: EDOC1100108365

Views: 11558

Downloads: 1805

Average rating:
This Document Applies to these Products

Related Version

Related Documents

Share
Previous Next