Parameter Settings
- If the parameters listed in this section have been set in Deployment Wizard, ignore the corresponding settings.
- If the PV and energy storage plants do not contain certain devices, such as power meters, EMIs, IEC103 devices, custom devices, and IEC104 devices, ignore the corresponding settings.
- Setting User Parameters
- Setting Parameters for Connecting to the Management System (V300R001C00)
- Setting Parameters for Connecting to the Management System
- Setting RS485 Communications Parameters
- Setting SPPC Communications Parameters
- Setting Parameters for the Slave SmartLogger
- Setting GOOSE Communications Parameters
- Setting MBUS Parameters
- Setting Inverter Parameters
SUN2000 is displayed for V300R001C00. - Setting PCS Parameters
This section does not apply to V300R001C00. - Setting CMU Parameters
- Setting ESU Parameters
- Setting ESC Parameters
- Setting ESR Parameters
- Setting HVAC Parameters
- Setting PID Module Parameters
- Setting Meter Parameters
- Setting EMI Parameters
- Setting STS Parameters
The STS can be connected to the SmartLogger over RS485 or FE. If the STS is connected to the SmartLogger over RS485, you need to manually add devices and set access parameters. If the STS is connected over FE, the SmartLogger automatically identifies the STS. - Setting IEC103 Device Parameters
- Setting IEC 104 Device Parameters
- Setting Custom Device Parameters
- Setting Parameters for Poverty Alleviation Monitoring Center
- Smart Tracking Algorithm