Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document.
Note: Even the most advanced machine translation cannot match the quality of professional translators.
Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing Front Panels
After the storage system has been installed, powered on, and is running properly, install front panels for a neat appearance. The panel appearance varies with the product model.
Prerequisites
The storage system has been correctly powered on, and the device indicator status is normal.
The front panels for 2 U devices are ready.
Procedure
- Align the upper side of a front panel with that of the device.
- Use the panel to cover the front side of the device, as shown in Figure 9-1.
- Verify that the front panel is properly installed.