No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade
STS-(3000K, 6000K)-H1 Smart Transformer Station Installation Guide
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Verifying the Installation and Cable Connections

Verifying the Installation and Cable Connections

No.

Acceptance criteria

1

All onsite components are installed correctly and securely.

2

All switches are OFF.

3

All cables are connected correctly and securely.

4

All screws are tightened.

5

Unused cable holes are covered with waterproof caps.

6

The cable holes in use are sealed.

7

The installation space is proper, and the installation environment is clean and tidy.

8

All doors of the STS are closed and properly locked.

Download
Updated: 2019-12-05

Document ID: EDOC1100115701

Views: 2785

Downloads: 207

Average rating:
This Document Applies to these Products

Related Version

Related Documents

Share
Previous Next