Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Hoisting Equipment

Hoisting Equipment

  • Before hoisting, ensure that the crane and hoisting ropes meet the load-bearing requirements.
  • When installing or removing the hoisting equipment, do not drag it on the container to prevent scratches.
  • Before installing the equipment, check the container for damage, such as holes and cracks, and check the equipment model. If the appearance is abnormal or the equipment model is incorrect, contact your dealer.
Table 3-1 Parameters for hoisting the container

Model

Packed Weight

Steel Rope Length

Steel Rope Quantity

STS-3000K-H1

< 15 t

> 6.5 m

4 PCS

STS-6000K-H1

< 23 t

> 6.5 m

4 PCS

Hoisting Precautions

Stage

Precautions

Before hoisting

Ensure that the crane can hoist a load heavier than 50 t, and the working radius is not less than 10 m. If the onsite environment does not meet the required working conditions, ask a professional to assess the conditions.

Only trained and qualified personnel should perform hoisting operations.

Check that hoisting tools are available and in good condition.

Ensure that the hoisting tools are secured to a load-bearing object or wall.

The weather condition should be good without wind when the container needs to be hoisted outdoors.

Ensure that the crane and steel hoisting ropes provide the required bearing capacity.

All doors of the container should be locked.

Ensure that steel cables are securely connected.

It is recommended that the container be hoisted from left to right or from right to left to ensure successful hoisting.

During hoisting

Do not allow any unauthorized person to enter the hazardous areas and never stand under the crane arm.

Ensure that the crane is properly located and avoid long-distance hoisting.

Ensure that the container is stable and the diagonal gradient of the container is less than or equal to 5 degrees.

Ensure that the angle between every two ropes is less than or equal to 90 degrees.

Lift and land the container slowly to prevent shock to equipment inside it.

Remove the ropes after ensuring that the container is placed evenly on the container bases.

Do not drag steel ropes and hoisting tools or bump hoisted objects against hard objects during hoisting.

Secure the container you have hoisted before hoisting another container.

Procedure

  1. Determine the installation position of the container based on the foundation design drawings.
  2. Measure the support points for the container on the foundation. Ensure that the support points are on the same plane and the deviation is no more than 5 mm.
  3. Hoist the container to the installation position using a crane.

    Figure 3-1 Hoisting equipment

  4. Remove the rainproof cloth from the container.
  5. Remove the customs lock using a pressure clamp.
  6. Remove the sealing plate.

    Figure 3-2 Removing the sealing plate

  7. Level the container.

    If it is difficult to open or close the container door, take out metal washers from the fittings and place them under the container support feet. You can adjust the container door for multiple times until it can be opened and closed smoothly.

    Figure 3-3 Leveling the container

Download
Updated: 2019-12-05

Document ID: EDOC1100115701

Views: 2819

Downloads: 207

Average rating:
This Document Applies to these Products

Related Version

Related Documents

Share
Previous Next