No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade
STS-(3000K, 6000K)-H1 Smart Transformer Station Installation Guide
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Appearance

Appearance

Figure 2-1 Appearance

(1) Low-voltage room (LV)

(2) Transformer room (TR)

(3) Medium-voltage room (MV)

(4) Position for the distributed power system (uninterruptible power supply, UPS)

(5) Position for the smart array controller (SACU)

(6) Double-swing door of the MV room

(7) Ring main unit

(8) Auxiliary transformer

(9) Double-swing screen door for the transformer room

(10) AC input cable hole (LV PANEL B)

(11) Manhole entrance

(12) AC input cable hole (LV PANEL A)

(13) Single-swing door for the LV room

(14) Double-swing door for the LV room

  

The STS-3000K-H1 does not have LV PANEL B configurations.

Figure 2-2 Container dimensions
Figure 2-3 Dimensions of the anchor pad
Download
Updated: 2019-12-05

Document ID: EDOC1100115701

Views: 3018

Downloads: 217

Average rating:
This Document Applies to these Products

Related Version

Related Documents

Share
Previous Next