No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade
STS-(3000K, 6000K)-H1 Smart Transformer Station Installation Guide
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Site Requirements

Site Requirements

  • Ensure that the equipment is installed in a well ventilated environment.
  • To prevent fire due to high temperature, ensure that the ventilation vents or heat dissipation system are not blocked when the equipment is running.
  • Do not expose the equipment to flammable or explosive gas or smoke. Do not perform any operation on the equipment in such environments.
Download
Updated: 2019-12-05

Document ID: EDOC1100115701

Views: 2805

Downloads: 207

Average rating:
This Document Applies to these Products

Related Version

Related Documents

Share
Previous Next