About This Document
Purpose
This document describes the SmartLi-512V-80AH intelligent lithium battery cabinet (lithium battery cabinet for short) in terms of its overview, transportation, storage, installation, cable connection, power-on commissioning, and maintenance, helping readers understand how to use and maintain the product.
Figures used in this document are for reference only.
Intended Audience
This document is intended for:
- Technical support engineers
- Hardware installation engineers
- Commissioning engineers
- Maintenance engineers
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Symbol |
Description |
---|---|
Indicates a hazard with a high level of risk which, if not avoided, will result in death or serious injury. |
|
Indicates a hazard with a medium level of risk which, if not avoided, could result in death or serious injury. |
|
Indicates a hazard with a low level of risk which, if not avoided, could result in minor or moderate injury. |
|
Indicates a potentially hazardous situation which, if not avoided, could result in equipment damage, data loss, performance deterioration, or unanticipated results. NOTICE is used to address practices not related to personal injury. |
|
Supplements the important information in the main text. NOTE is used to address information not related to personal injury, equipment damage, and environment deterioration. |
Change History
Issue |
Date |
Description |
---|---|---|
12 |
2022-11-15 |
Updated the safety information. |
11 |
2022-07-31 |
Added battery room fire safety information and FAQs. |
10 |
2022-04-30 |
1. Integrated the "Important Safety Instructions" section into the "Safety Information" section, and combined repeated information. 2. Changed "Overview" to "Product Description" and adjusted the sequence of sections based on task scenarios. 3. Integrated the component and cabinet specifications into the "Component Technical Specifications" section. 4. Moved the "Battery Cabinet Storage with Low SOC" section to the "Power-On Commissioning" section. 5. Moved the "User Interface" section to the monitoring module user manual. 6. Split the "Operations" section into the "Power-On Commissioning" and "Maintenance" sections. 7. Deleted the "Troubleshooting" and "Parts Replacement" sections. The relevant information needs to be obtained from technical support engineers. |
09 |
2022-01-30 |
1. Added the "Important Safety Instructions" section. 2. Unified the naming of fire extinguisher cylinder throughout the document. 3. Updated the maximum recharge interval corresponding to the SOC upon power-off in the "Battery Cabinet Storage with Low SOC" section. |
08 |
2021-08-20 |
1. Updated the maximum number of SmartLi cabinets that can be connected in parallel to 15. 2. Deleted pooling-related parameters and descriptions because the configuration is not supported. 3. Added the parameter description for the "Module quantity mismatch 4" alarm. 4. Updated the description about checking the pressure gauge in the "Routine Maintenance" section. 5. Added the description about the end pressure gauge in the section "Installing a Fire Extinguisher Cylinder." |
07 |
2021-03-22 |
1. Added the layout diagrams and technical specifications for the 7+7 and 7+0 scenarios. 2. Updated the extinguishant charging pressure requirements in the "Installing a Fire Extinguisher Cylinder" section. |
06 |
2021-01-10 |
1. Added the "Battery Recharging" section. 2. Added the "Transportation and Storage" section. |
05 |
2020-11-20 |
Deleted the "(Optional) Combiner Cabinet" section because the configuration is not supported. |
04 |
2020-09-28 |
Updated the "Safety Information" section. |
03 |
2020-08-07 |
1. Changed SmartLi-80Ah in the document name to SmartLi 2.0. 2. Added the "(Optional) Combiner Cabinet" section. |
02 |
2020-05-17 |
1. Changed "battery management module (BMU)" to "battery control unit (BCU)" in the document. 2. Added the description about protection function parameters in the "Technical Specifications" section. |
01 |
2019-11-29 |
This is the first official release. |