- About This Document
Safety Information
Product Overview
Technical Specifications
Transportation and Storage Requirements
Installation and Cable Connection
- Installation Clearances
Installation Preparations
- Transportation, Unpacking, and Checking
- Installation Process
Installing a Fire Extinguisher Cylinder and Cabinets (Without a Side Cabinet)
Installing a Fire Extinguisher Cylinder and Cabinets (With a Side Cabinet)
Installing Cables
- Installing Battery Modules
- Verifying the Installation
- Sealing a Cabinet
Power-On Commissioning
Maintenance
FAQ
- Are There Storage Period and Recharge Requirements for Battery Modules?
- Are There Restrictions on the UPS and Software Connected to the SmartLi?
- Can Alarms Generated by the SmartLi Be Reported to the UPS?
- What Are Conditions for Switching On a SmartLi Circuit Breaker?
- How Do I Conduct Shallow Discharge and Capacity Tests?
- Why Does the SmartLi Generate a Module Alarm "Version Incompatible" After Being Powered On Onsite?
- How Do I Connect a Communications Cable Between the SmartLi and the UPS?
- How Do I Power Off the SmartLi in Emergency?
- How Do I Restore the SmartLi After Powering It in Emergency?
- How Do I Export SmartLi Data?
- Acronyms and Abbreviations