Checking Tools and Auxiliary Materials
Installation Tools
Common tools include screwdrivers, diagonal pliers, ESD clothing, gloves, and wrist straps. For details, see Table 7-1.
Installation Meters
Table 3-13 lists the required meter.
Software Tools
Table 3-14 lists the required software.
Software |
Function |
How to Obtain |
---|---|---|
SSH tool |
Used to log in to a storage system and transfer files between the maintenance terminal and the storage system. |
This document uses PuTTY as an example. You can download PuTTY from the chiark website. To ensure successful login to the storage system, you are advised to use PuTTY of the latest version. |
SmartKit |
Used to check the overall status of the storage system after installation. |
Log in to https://support.huawei.com/enterprise, search for SmartKit, and download the software and documents of the latest version. |
Networking Assistant |
Provides the networking diagrams of storage systems for all standard or user-defined configurations. |
|
Power Consumption Calculation |
Quickly calculates the power consumption of storage systems to help evaluate the power supply capability of the equipment room. |
Documents
The documents that must be prepared before installation are as follows:
- Contract/Agreement, device configuration table, equipment room design, and construction drawing paper (provided by the customer).
- Table 3-15 lists the required product documents specific to your product models.
Table 3-15 Product documents
Document Name
Description
Product Description
Helps you understand the hardware structure, product specifications, and installation environment requirements in the installation preparation phase.
Security Configuration Guide
Guides you to configure security policies in the configuration phase.
Administrator Guide
Guides you to configure access permissions in the configuration phase.
Encryption User Guide
Guides you to configure the key management server in the configuration phase.