GTL_1.3.6.1.4.1.2011.5.25.142.2.2 hwGtlResourceUsedUp
Description
GTL/2/RESOURCE_USEDUP:OID [OID] Resource item [item-name] is nearly used up.
The trap was generated when the percentage of the resources used by the service module was not less than the 90% which is defined by the license.
Attribute
Alarm ID | Alarm Severity | Alarm Type |
---|---|---|
1.3.6.1.4.1.2011.5.25.142.2.2 | Major | environmentalAlarm(6) |
Parameters
Name | Meaning |
---|---|
OID |
Indicates the MIB object ID of the alarm. |
item-name |
Indicates the name of the resource item. |
Impact on the System
Under the control of the license, the usage percentage of service resources cannot exceed the threshold defined by the license. Therefore, if a larger license file cannot be applied for or activated, traffic loads cannot cater for the demand of the current operation scenario.
Possible Causes
The usage percentage of service resources reached or exceeded the threshold defined by the license.
Procedure
- Confirm whether the current license file is large enough. If not, apply for a larger license file.
- Use the new license file and run the license active license-name command to activate it.
- Collect alarm information and configuration information, and then contact technical support personnel.