No relevant resource is found in the selected language.
This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>
Your browser version is too early. Some functions of the website may be unavailable. To obtain better user experience, upgrade the browser to the latest version.
SmartACU2000D Smart Array Controller User Manual (with PID Modules)
This document describes the SmartACU2000D smart array control cabinet (with PID Modules), that is, the smart array control unit in terms of installation, cable connections, commissioning, and maintenance.
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document.
Note: Even the most advanced machine translation cannot match the quality of professional translators.
Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Powering On the System
Powering On the System
You have completed the power-on check.
You have put on proper PPE.
Ensure that the power voltage of the SACU is within the operating voltage range, and the three-phase input voltage is within the operating voltage range of the SmartMBUS and PID module.
Procedure
Turn on the single-phase power switch that controls the power supply from the remote transformer station to the SACU.
Turn on the three-phase power switch that controls the power supply from the remote transformer station to the SACU.
Check that the input voltages of all switches of the SACU are within appropriate operating voltage ranges using a multimeter.
Turn on the QF03 single-phase input switch in the SACU.