Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document.
Note: Even the most advanced machine translation cannot match the quality of professional translators.
Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Power-On Procedure
Procedure
- Connect the power cable to power on the Atlas 500 AI edge station.
After the server is powered on, the health indicator is steady green.
Figure 5-24 shows the position of the health indicator.