About This Document
Purpose
This document describes the SUN2000-(2KTL-6KTL)-L1 (SUN2000 for short) in terms of its installation, electrical connection, commissioning, maintenance, and troubleshooting. Before installing and operating the SUN2000, ensure that you are familiar with the features, functions, and safety precautions provided in this document.
Intended Audience
This document is Applicable to:
- Installers
- Users
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Symbol |
Description |
---|---|
Indicates a hazard with a high level of risk which, if not avoided, will result in death or serious injury. |
|
Indicates a hazard with a medium level of risk which, if not avoided, could result in death or serious injury. |
|
Indicates a hazard with a low level of risk which, if not avoided, could result in minor or moderate injury. |
|
Indicates a potentially hazardous situation which, if not avoided, could result in equipment damage, data loss, performance deterioration, or unanticipated results. NOTICE is used to address practices not related to personal injury. |
|
Supplements the important information in the main text. NOTE is used to address information not related to personal injury, equipment damage, and environment deterioration. |
Change History
Changes between document issues are cumulative. The latest document issue contains all the changes made in earlier issues.
Issue 10 (2023-02-13)
- Updated Preparing Cables.
- Updated (Optional) Connecting Signal Cables.
- Updated Creating a PV Plant and a User.
- Updated (Optional) Setting the Physical Layout of the Smart PV Optimizers.
- Updated Parameters Settings.
Issue 09 (2022-08-25)
- Updated Preparing Cables.
- Updated Connecting an AC Output Power Cable.
- Added Capacity Control.
- Updated SUN2000 Technical Specifications.
- Updated Grid Code.
- Added AI Energy Management Assistant (EMMA).
- Added Contact Information.
Issue 08 (2022-06-01)
Updated SUN2000 Technical Specifications.
Issue 07 (2022-03-04)
- Updated (Optional) Connecting Signal Cables.
- Updated Resetting Password.
- Updated Rapid Shutdown.
Issue 06 (2022-01-1)
- Updated (Optional) Connecting Battery Cables.
- Updated (Optional) Connecting Signal Cables.
- Updated Creating a PV Plant and a User.
- Updated Energy Control.
- Updated SUN2000 Technical Specifications.
Issue 05 (2021-08-10)
- Updated Connecting DC Input Power Cables.
- Updated (Optional) Connecting Battery Cables.
- Updated (Optional) Connecting Signal Cables.
- Updated App Commissioning.
- Updated Battery Control.
- Updated Device Commissioning.
- Updated Rapid Shutdown.
Issue 04 (2021-04-01)
- Updated Preparing Cables.
- Updated System Power-On.
- Updated Troubleshooting.
Issue 03 (2020-09-15)
- Updated Connecting PE Cables.
- Updated Troubleshooting.
Issue 02 (2020-06-09)
- Updated Preparing Tools and Instruments.
- Updated Preparing Cables.
- Updated Connecting DC Input Power Cables.
- Updated (Optional) Connecting Signal Cables.
- Updated (Optional) Setting the Physical Layout of the Smart PV Optimizers.
- Updated Resetting Password.
Issue 01 (2020-04-17)
This issue is the first official release.