No relevant resource is found in the selected language.
Your browser version is too early. Some functions of the website may be unavailable. To obtain better user experience, upgrade the browser to the latest version.
This document describes the SUN2000-(2KTL-5KTL)-L1 in terms of its installation, electrical connection, commissioning, maintenance, and troubleshooting.
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document.
Note: Even the most advanced machine translation cannot match the quality of professional translators.
Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Moving a SUN2000
Moving a SUN2000
Procedure
Hold the handles on both sides of the SUN2000, lift the SUN2000 from the packing case, and transport it to the installation position.
Move the SUN2000 with care to prevent device damage and personal injury.
Do not use the wiring terminals and ports at the bottom to support any weight of the SUN2000.
When you need to temporally place the SUN2000 on the ground, use foam, paper, or other protection material to prevent damage to its enclosure.