No relevant resource is found in the selected language.
Your browser version is too early. Some functions of the website may be unavailable. To obtain better user experience, upgrade the browser to the latest version.
SUN2000-(196KTL-H0, 200KTL-H2, 215KTL-H0) User Manual
This document describes the SUN2000-(196KTL-H0, 200KTL-H2, 215KTL-H0) Series in terms of their installation, electrical connections, commissioning, maintenance, and troubleshooting.
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document.
Note: Even the most advanced machine translation cannot match the quality of professional translators.
Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Check Before Power-on
Check Before Power-on
The inverter is installed correctly and securely.
Check that the DC switches and downstream AC output switch are OFF.
Check that all ground cables are connected securely and reliably.
All AC output power cables are connected correctly and securely, without open circuits or short circuits.
All DC input power cables are connected correctly and securely, without open circuits or short circuits.
The communications cable is connected correctly and securely.
Check that the maintenance compartment interior is clean and tidy, without foreign matter.
The maintenance compartment door is closed and the door screws are tightened.