No relevant resource is found in the selected language.
Your browser version is too early. Some functions of the website may be unavailable. To obtain better user experience, upgrade the browser to the latest version.
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document.
Note: Even the most advanced machine translation cannot match the quality of professional translators.
Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Checking the Nitrogen Pressure
Checking the Nitrogen Pressure
Context
The unit has been injected with 0.2–0.6 MPa nitrogen before delivery. Check the nitrogen pressure for nitrogen leaks.
Procedure
Pull out the spring pin and rotate the baffle plate to remove the air filter.
Figure 4-8 Removing the air filter
Take out the desiccant bag.
Check whether the bonnet of the needle valve inside the cabinet is missing.
If it is missing, contact technical support.
You can open or close the exhaust valve using a flat-head insulated torque screwdriver.
If no, rotate the exhaust valve counterclockwise. If gas flows out, the system is normal. If no gas flows out, contact technical support.
Figure 4-9 Exhaust valves
(1) Exhaust valve
Follow-up Procedure
Check that thermal insulation foam is in close contact with the pipes, there is no crack in each cutting position, and the chilled water valve is tightly wrapped by thermal insulation foam.