No relevant resource is found in the selected language.
Your browser version is too early. Some functions of the website may be unavailable. To obtain better user experience, upgrade the browser to the latest version.
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document.
Note: Even the most advanced machine translation cannot match the quality of professional translators.
Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
(Optional) Combining Units
(Optional) Combining Units
Procedure
Combine units. Secure the connecting kits in the connection positions on the display module side using screws, as shown in the following figure.
Figure 4-11 Combining units
Secure the connecting kits in the connection positions on the fan side in a similar way. (Secure the top connecting plates to the holes in the middle position shown in the figure using M6 bolt assemblies.)
Obtain the connecting plates and screws according to the packing list.
Ensure that the vertical distance between the top of each unit and the floor is 2450 mm (±2 mm) and that the tops of all units are on the same horizontal plane.
Ensure that the distance between combined units is less than or equal to 5 mm.