No relevant resource is found in the selected language.
Your browser version is too early. Some functions of the website may be unavailable. To obtain better user experience, upgrade the browser to the latest version.
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document.
Note: Even the most advanced machine translation cannot match the quality of professional translators.
Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Preparing for Power-On
Preparing for Power-On
Procedure
Check that the AC/DC auxiliary power module, main control module and fan drive module are inserted properly and the latches are locked.
Check that the fan switches QF3–QF6 and electric heater switch QF7 (optional) are turned on and the smart cooling product is properly grounded.
Verify that the input voltage meets the requirement.
Verify that the indoor unit power cable is connected properly.
If teamwork networking is required, verify that the teamwork cable is correctly connected.
Verify that the cable connections and DIP switch settings of the T/H sensors are correct.
Turn on the general switch. For a unit that has two power inputs, turn on the active power switch QF1 and standby power switch QF2.