About This Document
Purpose
This document describes the ECC800-Pro data center controller in terms of features, devices, user interfaces (UIs), and power-on commissioning, as well as frequently asked questions (FAQ) and troubleshooting measures.
This document describes all the functions of the ECC800-Pro. Certain functions are implemented by hardware such as the UPS and PDU, and may be unavailable if the hardware is not connected to the ECC800-Pro.
The ECC800-Pro functions described in the user manual are applicable to multiple FusionModule solutions, and some functions may be applicable only to a few FusionModule solutions. For details about the applicable ECC800-Pro functions, see the FusionModule solution documentation.
The figures provided in this document are for reference only.
This document applies to the ECC800-Pro data center controller. The software version is ECC800 V100R021C00.
Intended Audience
This document is intended for:
- Sales engineers
- Technical support engineers
- Maintenance engineers
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Symbol |
Description |
---|---|
Indicates a hazard with a high level of risk which, if not avoided, will result in death or serious injury. |
|
Indicates a hazard with a medium level of risk which, if not avoided, could result in death or serious injury. |
|
Indicates a hazard with a low level of risk which, if not avoided, could result in minor or moderate injury. |
|
Indicates a potentially hazardous situation which, if not avoided, could result in equipment damage, data loss, performance deterioration, or unanticipated results. NOTICE is used to address practices not related to personal injury. |
|
Supplements the important information in the main text. NOTE is used to address information not related to personal injury, equipment damage, and environment deterioration. |
Change History
Changes between document issues are cumulative. The latest document issue contains all updates made in previous issues.
Issue 04 (2021-10-09)
Updated Setting Parameters on the IVS1800 WebUI.
Issue 03 (2021-01-04)
Updated Main Control Module.
Updated T/H Sensor.
Updated Video Management.
Added High-Density Island Linkage.
Issue 02 (2020-09-07)
Added the UPS2000G_L and electricity meters of UPS input and output power distribution cabinet (PDC).
Issue 01 (2020-07-15)
This issue is the first official release.