No relevant resource is found in the selected language.
This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>
Your browser version is too early. Some functions of the website may be unavailable. To obtain better user experience, upgrade the browser to the latest version.
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document.
Note: Even the most advanced machine translation cannot match the quality of professional translators.
Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Powering On the Server
Powering On the Server
Case No.
4.1.4
Objective
To verify that the server can be properly powered on.
Test Networking
N/A
Prerequisites
The ambient temperature, altitude, and humidity in the equipment room meet the requirements. For details, see the server installation guide.
Procedure
Power on the server, press Delete as prompted to enter the BIOS, and select the Main screen.
Record the CPU models, the number of CPUs, and the number of DIMMs. Check that the displayed models and quantity are the same as the actual specifications.
Press F9 to restore default settings, and press F10 to save the settings and exit.
Expected Result
The server is properly powered on and the BIOS is accessed. The component information displayed in the BIOS screen is the actual information.