Installing the Cable Trays
Background
The racks have two cable trays (A-09 and A-10).
- The cable tray labeled "A-09" is installed between the left and center racks.
- The cable tray labeled "A-10" is installed between the right and center racks.
The installation methods for these two cable trays are the same.
Procedure
- Align the dowels at two ends of the cable tray with the location holes of the racks, as shown by
in Figure 6-32.
- Use your hand to tighten the captive screws at two ends, as shown by
in Figure 6-32.
Weak and heavy current cables must be separated. Bind weak current cables inside the cable tray, and bind the heavy current cables outside the cable tray.