Installing the 7-Outlet PDUs
Background
One 7-outlet PDU needs to be installed in the center rack and right rack each. They are installed in the same way. The following procedure uses one of them as an example.
Procedure
- Orient the 7-outlet PDU ports upward and place the PDU on the right rack. Tighten one M6 x 16 hex socket screw at each end, as shown in Figure 6-12.
- Install a 7-outlet PDU in the center rack in the same way. Figure 6-13 shows the installation position.