About This Document
Overview
This document describes the SUN2000-20KTL-M3, SUN2000-29.9KTL-M3, SUN2000-30KTL-M3, SUN2000-36KTL-M3, and SUN2000-40KTL-M3 (also referred to as SUN2000) in terms of their installation, electrical connections, commissioning, maintenance, and troubleshooting. Before installing and operating the SUN2000, ensure that you are familiar with the features, functions, and safety precautions provided in this document.
Intended Audience
This document is applicable to:
- Installers
- Users
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Symbol |
Description |
---|---|
Indicates a hazard with a high level of risk which, if not avoided, will result in death or serious injury. |
|
Indicates a hazard with a medium level of risk which, if not avoided, could result in death or serious injury. |
|
Indicates a hazard with a low level of risk which, if not avoided, could result in minor or moderate injury. |
|
Indicates a potentially hazardous situation which, if not avoided, could result in equipment damage, data loss, performance deterioration, or unanticipated results. NOTICE is used to address practices not related to personal injury. |
|
Supplements the important information in the main text. NOTE is used to address information not related to personal injury, equipment damage, and environment deterioration. |
Change History
Changes between document issues are cumulative. The latest document issue contains all changes made in earlier issues.
Issue 12 (2023-02-28)
Updated Product Introduction.
Updated Preparing Cables.
Updated (Optional) Installing the Smart Dongle.
Updated Technical Specifications.
Issue 11 (2023-01-10)
Updated Safety Information.
Updated Label Description.
Updated Tool Preparation.
Updated Man-Machine Interaction.
Updated Troubleshooting.
Updated Technical Specifications.
Added Contact Information.
Issue 10 (2022-09-26)
Updated Preparing Cables.
Updated Connecting the AC Output Power Cable.
Issue 09 (2022-06-30)
Updated Preparing Cables.
Updated Installing the DC Input Power Cable.
Updated Communication Modes.
Updated Man-Machine Interaction.
Updated SmartLogger Networking Scenario.
Updated Troubleshooting.
Updated Technical Specifications.
Added PV String Access Detection.
Issue 08 (2022-04-14)
Updated Preparing Cables.
Updated Communication Modes.
Updated Rapid Shutdown.
Issue 07 (2022-01-30)
Updated Selecting an Installation Position.
Updated Routine Maintenance.
Issue 06 (2022-01-04)
Updated Preparing Cables.
Updated Creating a PV Plant and a User.
Updated Grid-tied Point Control.
Updated Apparent Power Control on the Inverter Output Side.
Updated Technical Specifications.
Updated Grid Codes.
Issue 05 (2021-11-25)
Updated Connecting the AC Output Power Cable.
Issue 04 (2021-07-25)
Updated Preparing Cables.
Updated Technical Specifications.
Issue 03 (2021-04-15)
Updated Product Introduction.
Updated Preparing Cables.
Updated Installing the DC Input Power Cable.
Updated Technical Specifications.
Issue 02 (2020-11-20)
Updated Label Description.
Updated Selecting an Installation Position.
Updated Preparing Cables.
Updated Communication Modes.
Updated Technical Specifications.
Issue 01 (2020-10-15)
This issue is the first official release.