Installation Preparations
Floor Loading Capacity
The floor can bear the weight of the UPS and its optional components. In the case of rack-mounted installation, ensure that the floor can also bear the weight of the rack.
Installation Environment
- Do not install the UPS in a high-temperature, low-temperature, or damp place that is beyond the technical specifications.
- Keep the UPS far away from water, heat sources, and flammable and explosive substances. Install the UPS in an environment free of dust, volatile gas, salt, and corrosive materials. Avoid direct sunlight.
- Do not install the UPS in environments with conductive metal scraps in the air.
- The optimal operating temperatures for batteries are 20–30°C. Operating temperatures higher than 30°C shorten the battery lifespan, and operating temperatures lower than 20°C reduce the battery backup time.
Installation Clearances
Reserve a clearance of at least 500 mm from the front and rear of the chassis.