Device Power-On
Prerequisites
- Check that the drainpipe is correctly connected, the external thermal insulation foam is secured, and refrigerant has been filled in the system.
- Check that the smart cooling product circuit breaker in the upstream PDB is OFF.
- Check that the power cable is correctly connected and that the input voltage meets requirements.
- Check that the smart cooling product control unit and the ECC800-Pro are correctly connected.
Procedure
- Switch on the smart cooling product circuit breaker in the upstream PDB.
The electric heating belt of the crankcase starts working. Before starting the compressor, ensure that the electric heating belt of the crankcase has been preheated for more than 12 hours. Otherwise, maintenance is not performed.
- Commission the system after the electric heating belt of the crankcase has been preheated for 12 hours.